Start with the water analysis and crop system
For tomato, cucumber and capsicum greenhouses, send the irrigation-water analysis with the intended feed programme. Record source-water EC, alkalinity and any blending or treatment used on site. Low-EC coir cannot by itself resolve unsuitable irrigation water; the substrate and irrigation programme need to be evaluated together.
Choose buffered greenhouse slabs using hydrated dimensions, plant positions, gutter width and drainage layout. Share the planned planting date and a drawing of openings. Test a representative sample under your operating conditions before agreeing a repeat-order specification.
Bulk blocks for nurseries and substrate blending
Compare 5 kg blocks for hydration and blending with 50 L loose media for filling workflows. For block orders, specify treatment, particle grade, moisture basis and expanded volume. Nominal expansion options include 60 L, 70–80 L and 90–100 L by grade; compare them using the same hydration and measurement method.
If you need a peat-and-chip blend or husk chips, state the required size range and ratio. Particle structure and irrigation frequency belong in the trial brief. A higher expansion figure is not a guarantee of crop performance.
Receiving in Riyadh, Jeddah, Dammam or another destination
Include the final city and receiving address, preferred port if known, unloading facilities and the required arrival window. Ask for product, packing, ocean freight and inland transport to be separated in the quotation. A port quotation and a delivered-to-site quotation have different scopes.
Teral quotes manufacturing and export supply from India. Local Saudi stock, fixed freight and transit times are not implied. Confirm current import requirements with your importer or broker, and agree the document list and packing before shipment.
Distributor and private-label enquiries
For a distributor range, provide forecast quantities, pack sizes and intended applications. For OEM packaging, include the proposed Arabic and English artwork and identify who approves the product claims. Minimum quantities and production timing depend on the selected format.
Explore OEM and distribution options, Arabic buying guidance or UAE supply guidance.

